How long does installation take?

Four to six weeks to build and deliver after the configuration is signed off, then four to six hours on site.

The build is the long part and the installation is not. Four to six weeks between a signed configuration and delivery, then a single visit of roughly four to six hours to fit, power, test and hand over.

Why the build takes weeks

It is made to the configuration agreed for your lobby: the footprint, the finish, the trim, the lit band, the compartment mix. Sourcing and assembly account for most of it, software configuration and the opening stock selection for the rest. A provider offering same-week delivery is offering something off a shelf, which is a legitimate product but a different one.

What the on-site day involves

Delivery, fixing, power and network connection, testing every compartment, and handover. Residents arrive to a lobby that was a building site for one morning rather than one quarter. Lift access and a loading window are the two things worth confirming early.

What the clock actually starts on

Not the signature on the proposal. The configuration sign-off and the site survey, both of which have to be complete before anything is sourced. If a timeline in a proposal starts from contract date rather than from those two, ask which it means.

Get this answered for your building

A proposal states which figures are contractual and which are estimates, in writing.